ttalma
Well-known member
I am putting down some Shellac and it is drying very fast. I'm Getting a good finish and it looks good but I really have to move to blend the brush strokes. It is taking about 15-20 seconds from apllication, to being very sticky, (by sticky I mean causes a mostly unloaded brush to drag) and about 45 seconds until dry to the touch.
I am using super blond dewaxed shellac flakes. I have used the flakes from this bag before (several times in fact) and usually get about 2-2.5 min until very sticky and about 15-20 min untill dry to the touch.
It has been about 80 degrees every day and humid here. I am using a 4 lb cut. Using a golden taklon 2" brush to apply.
I've been appling the same finish to my test piece, and the bond seems to be good and the end result looks like good. Am I having a problem or should I just expect this on hot humid days? I would have expected the humidity to slow things down.
If I mixed it wrong, could that change the drying time?
I am using super blond dewaxed shellac flakes. I have used the flakes from this bag before (several times in fact) and usually get about 2-2.5 min until very sticky and about 15-20 min untill dry to the touch.
It has been about 80 degrees every day and humid here. I am using a 4 lb cut. Using a golden taklon 2" brush to apply.
I've been appling the same finish to my test piece, and the bond seems to be good and the end result looks like good. Am I having a problem or should I just expect this on hot humid days? I would have expected the humidity to slow things down.
If I mixed it wrong, could that change the drying time?